Project Sheet
MADRID - EXTREMADURA HIGH-SPEED LINE
Environment · ADIF ALTA VELOCIDAD
| Field | Value |
|---|---|
| Client | ADIF ALTA VELOCIDAD |
| File number | 3.25/20830.0153 – AV 020/25 |
| Title | CONSULTING AND TECHNICAL ASSISTANCE SERVICES FOR THE ENVIRONMENTAL MANAGEMENT OF WORKS ON LINES SUBJECT TO E.I.S., ENTRUSTED TO ADIF-AV. MADRID-EXTREMADURA HSL. |
| Awarded amount (excluding VAT) | €2,240,568.00 |
| Start date | 12/03/2026 |
| Execution period | 48 months, extendable by 12 additional months |

Description of the main tasks to be carried out
- Verify that the preventive, corrective and/or compensatory measures included in the Environmental Impact Statement are adopted, through the correct execution of the Environmental Surveillance Program.
- Propose new corrective measures if it is observed that the impacts are greater than expected or the initially proposed corrective measures are insufficient.
- Inform the Works Director of the environmental aspects to be considered, prior to the execution of scheduled works with environmental implications.
- Advise the Works Director regarding the environmental aspects of the works.
- Report to the ADIF-AV Deputy Directorate for the Environment on the results of the execution of the Environmental Surveillance Program for the works.
- Prepare periodic technical reports on the degree of compliance with the EIS.
- Prepare semi-annual technical reports during the works guarantee period (2 years) regarding the effectiveness of the environmental integration measures executed during their execution.
- Issue any reports requested by the Contract Director relating to environmental issues that arise during the works.
- Prepare the technical reports on the degree of compliance with the EIS, corresponding to Project Modifications and Complementary Works Projects that are prepared in parallel with the execution of the works.
- Compilation of environmental data from the works.
Works included in the contract
- Arroyo de Santa María - Navalmoral de la Mata Platform.
- Casatejada - Toril Platform.
- Overhead contact line and associated systems for the Bifurcación Peñas Blancas - Portuguese Border section.
- Implementation of the logistics platform in Navalmoral de la Mata.
- Río Tiétar - Malpartida de Plasencia Platform.
- Malpartida de Plasencia - Plasencia Station / Fuentidueñas Platform.
- Madrid Plasencia connection branch platform.
- Construction project for track renewal for the connection in Mérida.
- Construction project for the connection in Mérida. Platform and track.
- Electrical substations and autotransformer centers Plasencia-Badajoz.
- Remote control of energy for the Plasencia – Badajoz section.
- Removal of second-hand track material from the various actions of the Madrid-Extremadura-Portuguese Border High-Speed Line, in the Monfrague/Plasencia Station - Portuguese Border sections.
- Construction project for complementary measures for the Madrid-Extremadura-Portuguese border high-speed line. Section: Talayuela–Plasencia. Phase 2.
- Construction project for the landscape restoration of the slopes of the southern plinth of the viaduct over the Tagus River of the Madrid-Extremadura high-speed line. Section: Talayuela - Cáceres. Subsection: Cañaveral - Alcántara reservoir.
- Works for the execution of the construction project for sustainable, safe and environmental actions on the Madrid-Extremadura-Portuguese border high-speed line.
- Implementation of the Logistics Platform in Mérida.
- Implementation of the Mérida logistics platform. Safety and telecommunications installations. Phase 1.
- Urban footbridge at Mérida station.
- 5G Infrastructure Plasencia-Cáceres-Badajoz.
- Implementation of the Mérida logistics platform. Safety and telecommunications installations. Phase 2.
- Remodeling and sustainable integration of the Navalmoral de la Mata station.
- Project for 132 kV and 400 kV power lines - Malpartida de Plasencia - Plasencia Station / Fuentidueñas.
- Construction project for widening the evacuation corridors of the Santa Marina tunnel and for reinforcing and repositioning the upper module of the bird collision protection screen on the Pizarroso and Valdetravieso viaducts.
- Construction projects for the substation and autotransformer centers associated with the Casatejada electrical area and the remote control of energy for the Talayuela-Plasencia section of the Madrid-Extremadura high-speed line.
- Construction project for track laying of the Madrid-Extremadura high-speed line. Section: Talayuela - Access to the Navalmoral de la Mata Logistics Platform - Arroyo de Santa María.
- Construction project for a ballast assembly and storage base for track laying of the Madrid - Extremadura - Portuguese Border HSL. Section: Talayuela - Plasencia.
- Project for the overhead contact line and associated systems of the Madrid - Extremadura high-speed line. Section: Talayuela-Plasencia.
- Acoustic and vibration protection for the Madrid-Extremadura High-Speed Line. Section: Talayuela-Plasencia.
- Substation and autotransformer centers associated with the Casatejada electrical area and the remote control of energy for the Talayuela-Plasencia section of the Madrid-Extremadura high-speed line.
- Construction of an interoperable siding track for optimizing international freight traffic and complementary actions at Plasencia Station on the Madrid-Extremadura-Portuguese Border High-Speed Line.
- Construction project for track laying of the Madrid-Extremadura-Portuguese Border High-Speed Line. Section: Talayuela-Plasencia.
- Signaling systems, railway traffic management and fixed telecommunications. Talayuela-Plasencia.
- GSM-R mobile telecommunications on the Talayuela-Plasencia section.
Projects derived from the Madrid-Oropesa informative study:
- Section I: Toledo - Barcience
- Section II: Barcience - Cazalegas
- Section III: Cazalegas - Gamonal
- Section IV: Gamonal - Oropesa